It was quite exciting to see masonry work being done on our classrooms because that means new walls!!!
Concrete block walls are being laid in the classrooms on the gazebo side of the hallway. This worker is drilling holes so that rebar (metal poles) can be placed into the concrete blocks. |
These very diligent workers are placing the rebar into the blocks. |
The curved rebar has been placed into the existing concrete foundation. This will become part of the brick ledge and ultimately will be covered by the soil. Notice the black material that is used for blocking moisture from the brickwork. (See previous post for explanation.) |
This masonry worker lays the first row of brick on the bus lane side of the hallway. |