Coming back to CME after being out of town for a week resulted in seeing the results of a lot of work that has been done. Here are a few photos.
At the end of the hallway by the computer lab, they have also added plastic sheeting to help keep the dust out of the building. |
On the grassy area behind the kitchen, they have placed some concrete pads. At this point, I am unsure of their use. Permanent or temporary?? |
In the back parking area behind the kitchen, workers are busily creating trenches in the asphalt in order to lay water pipes. |
Workers are currently removing conduit and piping that are in the roof. |
Geometrically shaped trenches in the back lot. |
Workers are on the roof removing the conduit and pipes from the roof. The small back hoe is sitting where a small concrete storage shed once stood. |