Monday, July 18, 2011

Changes Keep Coming (Kitchen and Back Area)



Coming back to CME after being out of town for a week resulted in seeing the results of a lot of work that has been done.  Here are a few photos.

At the end of the hallway by the computer lab, they have also added plastic sheeting to help keep the dust out of the building.


On the grassy area behind the kitchen, they have placed some concrete pads.  At this point, I am unsure of their use.  Permanent or temporary??




In the back parking area behind the kitchen, workers are busily creating trenches in the asphalt in order to lay water pipes. 

This is the kitchen.  The last picture I posted showed the entire floor area covered in large chunks of tile and concrete.  Now they have cleaned most of it out and are putting gravel into the area.  Small equipment is coming in to knock down more walls. 

This view is from the back wall of the kitchen and looking through the new doorway they created a few weeks ago.  The closest area would have been a dry storage area.  The blue double doors were the doors for Primetime's storage closet in the cafeteria.  The hole in the wall on the right looks into the boiler room. 


Workers are currently removing conduit and piping that are in the roof. 
Geometrically shaped trenches in the back lot. 


Workers are on the roof removing the conduit and pipes from the roof. 
The small back hoe is sitting where a small concrete storage shed once stood.