| This view is from the location of our old portables. |
| This view is from the location of our old portables. |
| This work is being done on the Cardinal Lane side of the parking lot. They are preparing to lay new water pipes. |
| The jackhammer breaks up the pavement and the bucket scoops it away. |
| Working side by side. |
| After the pipe has been laid the workers fill it in the trench with gravel. |
| This view shows the trench, pile of blacktop, and trenches that continue onto the grassy area. |
| Stacks of pipe waiting to be laid. |
| Our first new, bright yellow fire hydrant. |
| A view of the gazebo area. No railing or sidewalks are left and some of the trees have had to be cut back. At this time, I am unsure of the future of the gazebo. |
| This is what is left after the backhoes broke up the floor from the small classrooms. |
| View from atop the fill dirt by the bus lane. |
| This view is from the door of the intermediate hallway. This is the former site of the old portables. Workers are bringing all of the top soil to this location. |
| Another view facing toward the front of Mary Queen's parking lot. |