Sunday, August 28, 2011

Take a Look at the Front Hallway Progress

The work inside the front hallway has been much quieter over the last week or so.  The interior walls and doorways have been installed.  New load-bearing walls have been added to each classroom.  Electricians have been making sure we have plenty of outlets and data ports for computers.  Some lucky workers have also been busy scraping up all of the old floor tiles. 


One of the classrooms is being used to store electrical components. 


In a previous post I showed the masons building the load-bearing walls.  This is the finished product. 
The new inset doorways with a portion of the old wall. 
Standing at the back door allows a view of the hallway with new walls and inset doorways. 

Our old floor tiles. 

After much scraping, there are pieces of tile left to be swept up. 
Getting up all of the final small pieces of tile.  Notice how the doorways will look from inside the classroom.