| One of the classrooms is being used to store electrical components. |
| In a previous post I showed the masons building the load-bearing walls. This is the finished product. |
| The new inset doorways with a portion of the old wall. |
| Standing at the back door allows a view of the hallway with new walls and inset doorways. |
| Our old floor tiles. |
| After much scraping, there are pieces of tile left to be swept up. |
| Getting up all of the final small pieces of tile. Notice how the doorways will look from inside the classroom. |