This is a giant dirt pile and deep hole that are at the end of the old hallway. |
The sidewalk and canopy that were at the end of the old hallway are now gone. |
The back steps that led to the village and play area were jackhammered this week. If you were anywhere around Clays Mill you could have heard the noise. |
The grass has been removed from the area against the back of the building. |
The blacktop that was in the back of the building has been removed. |
The walkway to the temporary hallway has been torn up. |
This is a view of the back of the gym and kitchen. The outer sidewalks have been removed. |
The fire hydrant that was installed last summer and then removed is now back. It is located toward the top of the parking lot. It will eventually be in a median. |
Current view of the new square footage |
The last of the remaining canopy and sidewalks have been removed. |
The sidewalk and railing all the way to the bus lane have been removed. |
Such a different look |
Piles of sidewalk rubble |
The upper sidewalk and rails have been removed. The concrete to the left is the perimeter of the new preschool playground that will be installed. |