LIBRARY AND MEDIA CENTER
| The library was all packed up and cleaned out by the last day of school. |
| A last view of the library. |
| A few items remain waiting to be moved. |
| Workers begin removing the ceiling tiles in the old library. |
| The new media center gets some soffett work. |
| The framing for the reading center has been installed. |
| Curved soffett accents over the reading center. |
| The computer area is getting drywall. |
NEW OFFICE AREA
| Soffetts are being drywalled in the entrance to the administrative area. |
| The front doors have been installed. |
| The grids for the ceiling tiles are being installed in the front vestibule. |
PRESCHOOL PLAYGROUND AND NEW PICK UP LANE
![]() |
| Workers laid the framing for the concrete that will go around the preschool playground. |
| The concrete has been poured. |
![]() |
| Workers continue to work on the new pick up lane that will extend around the back of our building. |
![]() |
| Gravel has been laid in the new lane. |
![]() |
| Work has begun on demolishing the hallway as seen from the cafeteria. |
| Worker, Josh Yeager, eagerly knocks down the wall by the main stairs. |
![]() |
| This is what remains of our old lobby. |
![]() |
| The ceiling in the car hallway is being renovated. |
| This is the lobby area after the ceiling tiles have been removed. |
| The boys' restroom by the elevator is being demolished. |
| This is the main stairwell after the wall was removed. |
CAFETERIA AND GYM
| Ceiling tiles were removed so that the workers could access the light panels and ductwork. |
| The new doorway leading to the administrative area has been opened. |
![]() |
| The stage has been cleared as they prepare for demolition. |
![]() |
| The stage area looks very different after the ceiling tiles have been removed. |
![]() |
| The entry into the cafeteria |
![]() |
| All of the ceiling tiles and ductwork have been removed. The cafeteria was once the school gym. |
![]() |
| An original gym light fixture |
![]() |
| The workers take down the duct work. |
| The next thing removed is the hardwood floor. Superintendent Darren turned the floor into piles of toothpicks. |
| The area where the lunch tables sat is now rubble. |
| Removing the hardwood floor |
| View from the gym entry |
| The stage area |
| A pile of flooring waits to be removed. |
| Many people didn't realize that there is a room behind the stage. It was used for storage and housed the furnace. The workers have cut a hole in the wall in order to remove the old furnace. |
| The portion of the building that was between the gym and cafeteria is being torn down. (Photo by Josh Yeager) |
| The area after everything was knocked down. (Photo by Josh Yeager) |
| The wall has mirrors and sinks from the restrooms that were in the gym. |
| The bulldozer clears away debris. |
| Remains of the boys' restroom |
| The view of where the gym entrance used to be. |
| A backhoe removed debris in the rain. |