As soon as there was a break in the rain, masons swarmed our campus.  The concrete block walls for the classrooms at the end of the building are going up. 

This picture shows the mud that they were having to drive and walk through last week due to the rain.

When you walk onto the site it seems like a lot of chaos.  After you watch for a few minutes you will see that everyone has a job and they work in unison. 

This area is getting walls last.  This side, which faces the track, will have the bathrooms and mechanical room. 

This view from the back shows the interior walls for the back classrooms. 

The next day they had completed the exterior walls for the back classrooms. 


As walls are built, electricians are on the job making sure that all electrical receptacles and conduit are placed in the right location.