Saturday, January 21, 2012

Demolishing the Front of the Building

The next phase of the renovation involves the hallways that face the parking lot.  This area included the two large kindergarten rooms and lobby downstairs plus the office and the two classrooms on either side upstairs.  In addition, the bathrooms by the library are also being demolished. 

The footers have been poured for the new addition of the building.  Gravel has been poured to fill in all of the areas. 

Pipes are being laid before the concrete work begins. 

The windows have been knocked out and all the components of the rooms are being ripped out and dumped. 

A view of the front area from the second floor. 

This portion of the front area will eventually be green space. 

View of the work area from the parking lot.