Friday, November 11, 2011

Lots of Updates

It has been a busy place around CME over the last couple of weeks.  There has been quite a bit of work completed that you can't actually see such as wiring and piping in the ceilings.  Other things are very obvious such as the HVAC units on the roof and paint on the walls. 


KITCHEN


Worker Hunter watches as his fellow worker makes sure the concrete forms are level.

Workers Hunter and Josh spread concrete for the footers outside the back door of the kitchen.

 
Brick walls have been built as part of a covered area that will be outside the back kitchen door. 


OUTSIDE

If you happen to drive by, you will see that the building looks as if it being attacked at every angle.  The current demolition area is the main front entrance.  They are laying concrete for footers that will hold walls on the new addition. 



 Workers are actually washing the brick.

The new HVAC units as seen from the back side of the front hallway.


Standing stately amidst the chaos, the gazebo holds strong so that it may become a part of the new building. 

 Inside the New Hallway


There have been many workers inside the new hallway.  Electricity, HVAC, brickwork, plumbing, and paint have been the focus over the last week.  
 

Workers are installing the tracking for the ceiling tiles in the front hallway. 
  

This worker is soldering copper piping together. 


This is the embellishment with white primer. 


This is the embellishment with its coating of blue paint.