Our new driveway in the back has been landscaped.
Front of Building
The entire parking lot and bus lane have been repaved. This is the machine that chews up the blacktop and then.....
....it spits the broken up debris into a dump truck.
Landscaping has been added to the front of the building.
Sod makes a big difference in the finished look of the front.
This is the fence and new landscaping that leads to the preschool playground.
Wow what a big difference!!
The roof and columns have been added to the canopy.
This is the new square footage in front of the gym. This area has a classroom and student restrooms.
Parents love our new benches out front.
Gym
It's a great shock to walk into the gym and see white walls.
The new stage area is getting soffit work.
The door in the center is Ms. Klinker's office and staff restroom. The doors to the left lead into the hallway that runs in front of the cafeteria entrance. This was formerly the front exit toward the parking lot.
The doorway on the left leads up the side of the stage. The center door is a storage room and the left door leads outside. This was formerly the small hallway that led to the cafeteria.
This is the new stage area. Notice the back wall, it is the wall that is extended in the cafeteria. The stage can be accessed from the gym or the cafeteria.
|